Our Projects

SOME OF OUR PROJECTS

 

 

1. Civil Construction works SRU Dangote Refinery and
Petrochemical Plant LFZ Lagos. On going

2. Fabrication of Tanking Rafter Structure, Chemie-DDMC, Dangote
Refinery and Petrochemical Plants On-Going Scope: as
fabricated basis.

3. Assembly and Erection of Steel Structures for Urea Bulk Storage,
Dangote Fertilizer Plant, Sub of Onshore Construction LLC,
Scope: 3000Tons, 98% completed, Ref; RCM Mr Jailaini
Makandar: 08057347910.

4. Assembly and Erection of Steel Structures for Transport Tower
No 7, Dangote Fertilizer Plant, Sub of Onshore Construction LLC,
Scope: 67 Tons, 98% completed, Ref; RCM Mr. Jailaini
Makandar: 08057347910.

5. Repairs/Renovations of Primary Health Centre. Kaduna State
Government, Kaduna State Public Procurement Authority. OnGoing

6. Drilling of a Solar-Powered Bore-Hole, Kogi State Government.
On-Going.

7. Fabrication of Pile Coupler. Onshore Construction LLC, Dangote
Fertilizer Plant Project, Lekki Free Zone, lagos Nig. On-going.
Ref: Site Manager (Mr Khritan Shetty 07059122875)

8. Construction of four unit attached terrace Building. Mercyland
Hospital Ota. 32, Ogunaike Street Otta. (Tools and Labour only)
Completed. Ref: Dr Deji Salmon Ibrahim (08037194225).

9. Rehabilitation of Elele-Alimini-Ahoada Road(10km), Sub
Contract; River State, Federal Road Maitainance Agency,

10. Rehabilitation of Obangede Ihima Road (10Km), Kogi State
(Sub- Contract: Main Contractor: Hastro Global Concept Ltd).

11. Tower Crane Maintenance and Supply of Steel Materials: Client
OnShore Construction LLC (Dangote Fertilizer Project, Lekki Free
Zone, Lagos Nig. On-Going. Ref Arun Kumar,

12. Fabrication from scratch and Erection of 62 nos (5 Tons each)
(Gantry Columns. Manaksia Industry Nig Limited) Industrial
Estate Otta. Completed March, 2015.
Ref: Mr Rahul Verma: (07046537915)

13. Fabrication and Erection of Colmns, Beams and Rakers. MINL
Industrial Estate, Otta Ogun State. Completed.
Ref: MR RAHUL VERMA. (07046537915), Mr. NAIDU
(08035495356)

14. Construction of WEIGH Bridge. AART I Steel Nig Ltd. Industrial
Estate Ota. Completed. Ref MR KAMLESH
VERMA: (09030577837).

15. Rehabilitation of Lao Airport Road(5km) ,Ilorin Kwara State.(Sub
Contract, Main Contractor: Hastro Global Concept Ltd Ilorin.
16. Construction of an Ultramodern ICT Centre, Testing ground
Road Oshogbo, Osun State.
On-going. Ref: Mr. HARUN (08035282354).

17. Construction of Obangede specialist hospital Estate road(5km)
and drainages (In Partnership with Hastro Global Concept
Limited) FG/ADF.

18. Rehabilitation of Ita Olodan Danialu Road (In Partnership with
Hastro Global Concept) (1km), Kwara State Ministry of Works,
On-going.

19. Infrastructural Development at Harmony Reservation Area
including Road network, drainage electrification and water
supply. (NTA) Ilorin, (Sub contract, Mian Contractor: Hastro
Global Concept Limited). On going

20. Construction of 12-men Office complex Kwara State House of
Assembly, Ilorin. Kwara State Government (Sub Contract,Main
Contractor: Hastro Global Concept Limited ).

21. Fabrication and Erection of Columns, Beams and Rakers. MINL
industrial estate, Otta Ogun State. Completed. Ref: MR RAHUL
VERMA. (07046537915), Mr. NAIDU (08035495356)

Project Gallery